+Ferrule | FerruleXSkip to content
Ferrule — FerruleX stainless steel fittings

Ferrule

Stainless ferrule for compression fittings. SS304/316. FerruleX factory RFQ. Stocked sizes ship fast.

Brand
FerruleX
Material
SS304 / SS316
Type
Compression ferrule
Size
Match tube OD / series on RFQ

Request a factory quote

  • Stock5–7 days after confirmation
  • Make to order15–25 days production
  • Payment / termsT/T ~30% or L/C · FOB Shanghai / Ningbo
  • OEMLogo and drawings accepted · price on RFQ

Description

Ferrules bite and seal on tube OD inside a double-ferrule nut. FerruleX stocks stainless ferrules for instrumentation tube in SS304/SS316. Match the ferrule to the tube OD and the nut series — mixing brands risks leaks. Quote OD and series with the rest of the compression BOM.

Tell FerruleX the size, grade and quantity on the RFQ. Stocked catalog lines ship after quote confirmation; custom dimensions need a drawing.

Factory
Quoted from the Shengquan / FerruleX stainless catalog.
Order
RFQ only — no cart checkout.
Grade
SS304 / SS316 options on most lines.

Specifications

SpecificationValue
BrandFerruleX
MaterialSS304 / SS316
TypeCompression ferrule
SizeMatch tube OD / series on RFQ

Request Quote

Prices stay on the RFQ. Send size, material, quantity and destination — the factory replies with price, lead time and packing.

Request a factory quote

Shipping & packing

Parts ship in a bag, inner carton and export carton. Large lots can go in a wooden case with a packing list and invoice. Default term is FOB Shanghai or Ningbo. Full notes are on thedelivery page.

Questions buyers ask

What should I send for a quote?

Size, material (SS304, SS316 or SS316L), quantity, end connection and destination. Add a sketch if the two ends are different.

How fast can this ship?

Stocked sizes usually leave 5–7 days after you confirm the quote. Make-to-order runs are about 15–25 days in production, then transit. Name the port if you want CIF.

Can I order a small trial or put my logo on it?

Yes. Trial quantities are quoted, and OEM marking or drawings are accepted. Payment is normally T/T with about 30% deposit, balance before shipment, or L/C at sight.

Related products