+Weld-End Needle Valve | FerruleXSkip to content
Weld-End Needle Valve — FerruleX stainless steel fittings

Weld-End Needle Valve

Weld-End Needle Valve: stainless steel needle valve with weld prep for permanent metering. FerruleX RFQ. Stocked sizes ship fast. Export RFQ only — no cart.

Brand
FerruleX
Material
SS304 / SS316 / SS316L
Ends
Weld
Type
Needle valve
Order mode
Factory RFQ

Request a factory quote

  • Stock5–7 days after confirmation
  • Make to order15–25 days production
  • Payment / termsT/T ~30% or L/C · FOB Shanghai / Ningbo
  • OEMLogo and drawings accepted · price on RFQ

Description

Weld-end stainless steel needle valves create permanent metering points on process tubing that cannot use demountable ferrules. FerruleX SS304/SS316/SS316L valves follow weld prep details on your RFQ for skids that ban tube fittings at the valve. Stem metering stays fine; only the ends change to weld. Custom weld ends are OEM after drawing review. Attach weld sketches and size to the FerruleX factory RFQ. Protect seats from weld heat with purge and cooling so the needle still meters smoothly. Brand FerruleX; Material SS304 / SS316 / SS316L; Ends Weld; Type Needle valve; Order mode Factory RFQ.

Keep seats cool during welding; a warped needle seat will never meter smoothly afterward. If future maintenance must remove the valve, reconsider a compression or threaded needle instead. FerruleX caps weld ends for clean arrival on export shipments. If future service must remove the valve, reconsider compression ends instead of permanent welds.

Ends
Weld preparation.
Control
Needle metering stem.
OEM
Custom weld ends from drawings.

Specifications

SpecificationValue
BrandFerruleX
MaterialSS304 / SS316 / SS316L
EndsWeld
TypeNeedle valve
Order modeFactory RFQ

Request Quote

Prices stay on the RFQ. Send size, material, quantity and destination — the factory replies with price, lead time and packing.

Request a factory quote

Shipping & packing

Parts ship in a bag, inner carton and export carton. Large lots can go in a wooden case with a packing list and invoice. Default term is FOB Shanghai or Ningbo. Full notes are on thedelivery page.

Questions buyers ask

What should I send for a quote?

Size, material (SS304, SS316 or SS316L), quantity, end connection and destination. Add a sketch if the two ends are different.

How fast can this ship?

Stocked sizes usually leave 5–7 days after you confirm the quote. Make-to-order runs are about 15–25 days in production, then transit. Name the port if you want CIF.

Can I order a small trial or put my logo on it?

Yes. Trial quantities are quoted, and OEM marking or drawings are accepted. Payment is normally T/T with about 30% deposit, balance before shipment, or L/C at sight.

Related products